Skip to main content
Menu
Design & Drafting

Site Feasibility and Zoning Studies

Find out what you can build before you buy a lot or start design. We review zoning, setbacks, height and coverage limits, utilities, flood zones and permit requirements, and give you a clear written summary.

Estimate Cost
Custom quoteWritten quote before work starts
48States covered
PESealed drawings
3-7Typical days

Written quote before any work begins. Final pricing is confirmed in writing before work begins.

What the permit set includes

Drawings your jurisdiction will ask for

  • ✓ Zoning district, permitted uses and conditional use review
  • ✓ Setbacks, height limits, lot coverage and floor area allowances
  • ✓ Parking, access and driveway requirements
  • ✓ Flood zone, easement and utility availability check
  • ✓ Buildable area diagram on your survey or plat
  • ✓ List of permits and approvals the project will need
Why it is required

What the plans reviewer is looking for

Zoning and site rules decide what you can build long before structural design starts. A short feasibility review tells you how large the building can be, where it can sit on the lot, what uses are allowed and which approvals you need, so you can make a buy, lease or design decision with confidence.

What to send us for a quote

  • The property address or parcel number
  • A survey or plat, if you have one
  • What you want to build or how you plan to use the property
  • Any listing information or seller documents
  • Your deadline, such as a purchase contract date

Do not have everything? Send what you have and we will tell you what is missing.

What affects the price

  • Number of parcels or lots
  • Residential or commercial use
  • Whether a buildable area diagram is needed
  • Research into variances, overlays or historic districts

See all starting fees. Your final price is confirmed in writing before work begins.

How it works

  1. 1
    Send your files

    Upload plans, photos or a sketch. Whatever you have is enough to start.

  2. 2
    Get a written quote

    We confirm the price and timeline in writing before any work begins.

  3. 3
    A licensed PE prepares and seals

    Typical turnaround is 3-7 business days. Rush is available where scope allows.

  4. 4
    Submit and get approved

    If the plans reviewer has comments on drawings we produced, we answer them.

Call a licensed engineer
FAQs

Frequently asked questions about Site Feasibility & Zoning Study

When should I order a feasibility study?

Before you buy land, sign a lease or pay for full design. It is the cheapest point to find a deal-breaker.

What do I get?

A written summary of what the site allows, a buildable area diagram, and a list of the permits and approvals your project will need.

Can you check a lot in another state?

Yes. We review the local zoning code and maps for the exact address you send us.

Not sure what your jurisdiction requires?

How can we help you?Pick whatever is easiest for you.
Call us1 (938) 246-8550 Email usinfo@uspermitdrawings.com

No payment now. You get a fixed scope and price first.