Skip to main content
Menu
Design & Drafting

Energy Code Compliance and HVAC Load Calculations

REScheck, COMcheck and state energy compliance forms, plus Manual J, S and D HVAC load and duct calculations that building departments ask for.

Estimate Cost
Custom quoteWritten quote before work starts
48States covered
PESealed drawings
3-7Typical days

Written quote before any work begins. Final pricing is confirmed in writing before work begins.

What the permit set includes

Drawings your jurisdiction will ask for

  • ✓ REScheck reports for residential projects
  • ✓ COMcheck reports for commercial envelope, lighting and mechanical
  • ✓ State-specific energy forms where required
  • ✓ Manual J heating and cooling load calculations
  • ✓ Manual S equipment selection and Manual D duct design
  • ✓ Insulation and window performance summaries
Why it is required

What the plans reviewer is looking for

Energy codes set minimum insulation, window, lighting and equipment performance. Building departments want calculations showing the design complies and that HVAC equipment is sized to the actual load, not guessed.

What to send us for a quote

  • Floor plans and elevations
  • Window and insulation specifications
  • HVAC equipment information, if known
  • Building orientation
  • Your project address

Do not have everything? Send what you have and we will tell you what is missing.

What affects the price

  • Residential or commercial
  • Building size
  • Load calculations, duct design or both
  • Number of systems or zones

See all starting fees. Your final price is confirmed in writing before work begins.

How it works

  1. 1
    Send your files

    Upload plans, photos or a sketch. Whatever you have is enough to start.

  2. 2
    Get a written quote

    We confirm the price and timeline in writing before any work begins.

  3. 3
    A licensed PE prepares and seals

    Typical turnaround is 3-7 business days. Rush is available where scope allows.

  4. 4
    Submit and get approved

    If the plans reviewer has comments on drawings we produced, we answer them.

Call a licensed engineer
FAQs

Frequently asked questions about Energy & HVAC Load Calculations

Do I need a Manual J?

Many jurisdictions require it for new homes, additions and HVAC replacements. We confirm your local rule.

Which energy code applies to me?

It depends on your state and city. We check the adopted edition for your address.

Can you prepare forms for California Title 24?

Energy documentation for state-specific programs can be included. We confirm what your city requires first.

Not sure what your jurisdiction requires?

How can we help you?Pick whatever is easiest for you.
Call us1 (938) 246-8550 Email usinfo@uspermitdrawings.com

No payment now. You get a fixed scope and price first.